- (407) 729-5881
- 24 hours/ 7 Days a Week
- Palm Harbor, Florida
Menu
TEMPORARY WETLAND CROSSINGS DONE RIGHT THE FIRST TIME.
For local, state, and federal roadway projects, temporary wetland crossings are designed and constructed to assure there is zero impact to the wetlands being crossed. These temporary wetland crossings are calculated to carry the loads of the cranes, trucks, and materials needed to construct permanent bridges. Once the construction of the new bridge is completed, the temporary wetland crossing is removed, and the wetlands are left with a zero footprint from the construction activities.
Absolute Erosion Control LLC was awarded and completed several contracts with wetland crossings throughout Pasco County in Florida. With a combination of geogrids and high-performance polypropylene geotextile fabrics, our temporary wetland crossings successfully allowed the contractor to build all their bridges with no delays due to reconstructing the temporary crossings or additional costs from environmental impacts.
Please see photo gallery for past and current projects of Absolute Erosion Control LLC’s installation.
Absolute Erosion Contol LLC does not subcontract any portion of its scope of works. Our team consists of educated and experienced installers. All of our team members have great pay, benefits, and take pride in their work. At the end of the day, what is left on site is our finished product and that alone is what helps bring back business over and over again.
When clients and potential customers see our finished product, they can immediately see that it was installed 100% in compliance with local, state, and federal regulations. Our team understands that temporary wetland crossings are a critical tool in preventing soil erosion and controlling sediment runoff during construction activities and ultimately protecting the environment.
With a proven track record, Absolute Erosion Control LLC has successfully installed over 10 miles of temporary wetland crossings with zero impact to wetlands. This significant milestone is a testament to our dedication to preserving the environment and ensuring erosion control at numerous construction sites. We take pride in our contribution to safeguarding local ecosystems and water quality, all while helping our clients stay compliant with local, state, and federal regulations.